| Story | Length (ft) | Color | Actions |
|---|---|---|---|
| No 1st story runs. | |||
| 1st Total | 0.0 ft | ||
| No 2nd story runs. | |||
| 2nd Total | 0.0 ft | ||
| No 3rd story runs. | |||
| 3rd Total | 0.0 ft | ||
| Notation | Total Feet | A Elbows | B Elbows | Color | Ground Spout | Actions |
|---|---|---|---|---|---|---|
| No downspout runs. Click "+ Add Downspout Run" to add one. | ||||||
Notation Format:
Use A for A elbows, B for B elbows, and numbers for feet. Examples:
A2A10A = A elbow + 2ft + A elbow + 10ft + A elbow (12ft, 3 A elbows)BB13A12B10BB = B elbow + B elbow + 13ft + A elbow + 12ft + B elbow + 10ft + B elbow + B elbow (35ft, 1 A elbow, 4 B elbows)AB10B2A = A elbow + B elbow + 10ft + B elbow + 2ft + A elbow (12ft, 2 A elbows, 2 B elbows)These modifiers adjust subcontractor pay for complex work conditions.
$40.00 each
+$1.00/LF
$150 flat
Base pay covers fabrication and installation. Tear-off is separate.
Upload photos or documents (images, PDF, Word documents)
Choose a package
or $125/month autopay
Installation: seamless fabrication, hidden hangers, 2-year warranty. Maintenance Plan: 2 cleanings/year, condition report, priority scheduling.
Add gutter runs to see material requirements