Gutter Runs (Run by Run)
Default Settings
| Story | Length (ft) | Type | Color | Actions |
|---|---|---|---|---|
| No 1st story runs. | ||||
| 1st Total | 0.0 ft | |||
| No 2nd story runs. | ||||
| 2nd Total | 0.0 ft | |||
| No 3rd story runs. | ||||
| 3rd Total | 0.0 ft | |||
Downspout Runs
Default Downspout Settings
| Notation | Total Feet | A Elbows | B Elbows | Size | Color | Ground Spout | Actions |
|---|---|---|---|---|---|---|---|
| No downspout runs. Click "+ Add Downspout Run" to add one. | |||||||
Notation Format:
Use A for A elbows, B for B elbows, and numbers for feet. Examples:
A2A10A= A elbow + 2ft + A elbow + 10ft + A elbow (12ft, 3 A elbows)BB13A12B10BB= B elbow + B elbow + 13ft + A elbow + 12ft + B elbow + 10ft + B elbow + B elbow (35ft, 1 A elbow, 4 B elbows)AB10B2A= A elbow + B elbow + 10ft + B elbow + 2ft + A elbow (12ft, 2 A elbows, 2 B elbows)
Additional Measurements
Difficulty Modifiers
These modifiers adjust subcontractor pay for complex work conditions.
$40.00 each
+$1.00/LF
$150 flat
$25.00 each
Labor Rates
Install/Clean/Realign (per ft)
Installation (2025 Pay Table - per ft)
Base pay covers fabrication and installation. Tear-off is separate.
Material Rates
Overhead & Profit
Payment Terms
Job Documents
Upload photos or documents (images, PDF, Word documents)
Notes
Quote Summary
Labor Costs
Installation Labor (story-based)$0.00
Total Labor Cost$0.00
Material Costs
Gutter Material (0 ft)$0.00
Downspout Material (0 ft)$0.00
Total Material Cost$0.00
Subtotal (Labor + Materials)$0.00
Overhead (15.0%)$0.00
Profit (35.0%)$0.00
Final Price$0.00
Payment Terms
Deposit (50%)$0.00
Balance Due on Completion$0.00
Subcontractor payment due in 2 days
ABC Supply Order
Add gutter runs to see material requirements