Job Information
Gutter Runs (Run by Run)
Default Color
| Story | Length (ft) | Color | Actions |
|---|---|---|---|
| No 1st story runs. | |||
| 1st Total | 0.0 ft | ||
| No 2nd story runs. | |||
| 2nd Total | 0.0 ft | ||
| No 3rd story runs. | |||
| 3rd Total | 0.0 ft | ||
Downspout Runs
Default Color
| Notation | Total Feet | A Elbows | B Elbows | Color | Ground Spout | Actions |
|---|---|---|---|---|---|---|
| No downspout runs. Click "+ Add Downspout Run" to add one. | ||||||
Notation Format:
Use A for A elbows, B for B elbows, and numbers for feet. Examples:
A2A10A= A elbow + 2ft + A elbow + 10ft + A elbow (12ft, 3 A elbows)BB13A12B10BB= B elbow + B elbow + 13ft + A elbow + 12ft + B elbow + 10ft + B elbow + B elbow (35ft, 1 A elbow, 4 B elbows)AB10B2A= A elbow + B elbow + 10ft + B elbow + 2ft + A elbow (12ft, 2 A elbows, 2 B elbows)
Additional Measurements
Difficulty Modifiers
These modifiers adjust subcontractor pay for complex work conditions.
$40.00 each
+$1.00/LF
$150 flat
Labor Rates
Installation (2026 Pay Table - per ft)
Base pay covers fabrication and installation. Tear-off is separate.
Material Rates
Overhead & Profit
Payment Terms
Job Documents
Upload photos or documents (images, PDF, Word documents)
Notes
Estimate
Date2026-06-18
Est. #OSP-2026-0001
Prepared forHomeowner Name
Choose a package
Annual Gutter Maintenance Plan$1,500.00
or $125/month autopay
- ✓2 cleanings per year
- ✓Full debris removal
- ✓Downspout flush
Single Cleaning (Non-Plan)$0.00
- ✓Enter measurements to see options
Essential$0.00
- ✓Enter measurements to see options
StandardRecommended$0.00
- ✓Enter measurements to see options
Premium$0.00
- ✓Enter measurements to see options
Installation: seamless fabrication, hidden hangers, 2-year warranty. Maintenance Plan: 2 cleanings/year, condition report, priority scheduling.
ABC Supply Order
Add gutter runs to see material requirements
